Portal de Puerto Lumbreras

www.portaldepuertolumbreras.com

Puerto Lumbreras - SpanishPuerto Lumbreras - English
detail of Puerto Lumbreras

 

IU-V: "The PP starts the countdown to the burial of the Murcia Region Av" (15/03/2013)

Today, Friday, March 15 is the last phase for the expropriation of the land needed for the burial of the Avd region of Murcia, with the lifting of the minutes prior occupation, and affecting a sole owner, once the Council Government of the Region of Murcia City Council authorized the Puerto Lumbreras to carry out urgent occupation of the land required for the execution of these works.

With this measure the city of Puerto Lumbreras intends to dispose of the land required for the construction of that underpass and you are justified by "the existence of the heavy traffic that supports the Avenue of the Municipality of Murcia, also used by large trucks tonnage and buses reaching traffic delays occur that require the activation and regulation thereof by the Local Police, which is necessary to the burying of the avenue to mitigate referred to circulatory congestion experienced by the area with the allow the circulatory sufficiency and increase road safety "report two separate arguments for municipal technical services and local police.

Victor Romera, IU-Greens Spokesperson in the city of Puerto Lumbreras, recalled today that "we reject the reasons and the sales pitch used by the council to justify to the Regional Government the need to carry out the emergency occupation of land and ultimately the aforementioned underground, as we believe that do not conform to reality and are oversized, not existing in the zone of saturation circulatory problems or road safety, nor to date traffic is regulated with the involvement of actors Local Police in the said road. "

For the formation of the government team left forgets equally the events in Puerto Lumbreras on 28 September with the flood that hit the town, and have been in service this project, no doubt would have led to a situation of increased risk for residents of the area affected by the neighboring buildings and the users of this route, as it would have created a dangerous situation currently nonexistent.

For IU-V is a project that does not obey the general interest, nor to offer new opportunities for economic development for the population of the municipality, or an improvement in basic infrastructure to serve the public.

Instead, say "cause the closure of many shops in the area, generate significant mobility problems, nuisance to neighbors, affect the buildings in the area and above all it is an unnecessary work, and has rejected and misunderstanding of the vast majority of public opinion. "

Source: IU-verdes Puerto Lumbreras

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información