Portal de Puerto Lumbreras

www.portaldepuertolumbreras.com

Puerto Lumbreras - SpanishPuerto Lumbreras - English
detail of Puerto Lumbreras

 

City Council and Improve on all roads and entrances of Puerto Lumbreras (17/03/2015)

The Mayor and the Minister of Public Works and develop a working day to monitor projects and improvement works on all roads in Puerto Lumbreras.

During the meeting have addressed the state of the access roads to the municipality, the main access to farms and livestock, as well as removing blackheads and improvement works that have been developed on the roads of the town in recent years.

Mª Angeles Tunisia explained that "have been developed and improvements continue to access and other roads connecting to the town of Puerto Lumbreras as D11, D16 roads, and D19 which are developed at present, besides the D17 to be tendered in the coming weeks. "

The Minister of Development, Public Works and Planning, Francisco Barnabas, and the Mayor of Puerto Lumbreras, Maria Angeles Tunisia, have developed a working day to monitor projects and improvement works that develop on all roads in Puerto Lumbreras.

During the workshop have tried various topics with emphasis on the state of access roads to the municipality and the state in which are the main access to agricultural and livestock, as well as new projects such as installing back lighting of the road D-11, and the construction of a roundabout cattle market located in the D-16.

Also during the meeting were announced that "in the coming weeks also works developed in the D17 road connecting the town with Almendricos and the road of Eagles".

On the other hand, have addressed the removal of blackheads to improve road safety of citizens, as well as the works of the RM-D19 road between Puerto Lumbreras with Lorca Eagles, through the sale of Ceferino and crossing the Sierra de Beacon.

The road, tertiary to the regional road network has great significance for the region, being the direct communication of an extensive agricultural area to the coast.

Thus, it is developing a comprehensive performance improvement of the road, as well as improving communication between municipalities, contributes to the safety of drivers on a road by passing an annual average intensity almost daily 1,000 vehicles and 500 in the stretch running through the mountains.

The upgrading works are concentrated in the section between Puerto Lumbreras and RM-620 highway, which connects Puri-Pulpí.

The action involves the repair of damage to the road with improved platform width and its layout.

Thus, the platform will increase from the current five meters to 8.5 meters, which will provide two lanes 3 meters, roadside berms a meter and 0.5 meters.

Therefore, modification of the platform will result in a significant increase road safety by allowing overtaking vehicles with increased security measures.

Furthermore, the work includes improving some curves and total reconstruction of the firm, giving it one hot asphalt replacing the old surface treatment, and the renewal of all signaling and improving drainage.

Also during the working day, the Mayor and the head of Development, Public Works and Regional Planning have done a review of recent actions taken in Puerto Lumbreras Lumbreras.

In this sense, Maria Angeles Tunisia, explained that "has worked on the D11 road connecting Puerto Lumbreras with Lorca, in the D26 road connecting the hamlet of La Station-Esparragal with the area of ​​Puri, the D16 with creation of a new roundabout linking Puerto Lumbreras with Station-Esparragal, and now we are with the actions of the D19 ".

Source: Ayuntamiento de Puerto Lumbreras

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información